LSSCO / Uriyel SiteWorks

What can your site actually prove?

Uriyel independently reviews the operational evidence around one connected site and determines what is Verified, Unverified, Missing or Conflicting.

VerifiedUnverifiedMissingConflicting
ScopeOne siteOne primary connected-building environment.
DeliveryFive daysAfter receipt of the agreed evidence set.
Founding rate£2,000Fixed fee for the first three engagements.

No production changes. No passwords required. No penetration testing.

What we test

Operational claims against the evidence behind them.

The Sprint is deliberately narrow. We review what the organisation and its appointed providers can demonstrate, not what a policy document says should exist.

01

Vendor and remote access.

Who can connect, through which route, under whose approval and whether that access is still required.

02

Operational authority.

Named owners, decision rights, escalation routes and responsibility for the connected environment.

03

Isolation responsibility.

Who can isolate or disable the relevant system, and what evidence supports that authority.

04

Backup and recovery.

Restoration records, tests, responsible parties, exceptions and owner acceptance.

05

Product and support status.

Vendor provenance, support route, lifecycle position, end-of-life exposure and accepted exceptions.

06

Configuration and change history.

What changed, when it changed, who authorised it and which records support the current position.

Evidence states

Four possible findings. No ambiguity.

A Proof Sprint does not manufacture confidence. It separates supported facts from unsupported assumptions.

Verified

Supported.

The required evidence supports the operational claim for the defined scope.

Unverified

Not demonstrated.

A claim exists but sufficient supporting evidence has not been produced.

Missing

Absent.

The required record, authority, evidence or recovery proof is not available.

Conflicting

Contradictory.

Available records, dates, approvals or responsibilities disagree.

Deliverables

What the client receives.

The output is designed to be useful to management, facilities teams and technical providers without turning the engagement into another oversized consultancy report.

RESULT

Executive Proof Result.

A concise management-level view of what is Verified, Unverified, Missing or Conflicting.

MATRIX

Evidence Matrix.

The operational claim, evidence supplied, finding and responsible party in one controlled record.

GAPS

Priority Gaps.

The missing or contradictory items that require remediation, clarification or an owner decision.

PACK

SiteWorks Proof Pack.

A portable controlled pack containing the reviewed evidence record, findings and unresolved items.

Governance before collection

Purpose, access and distribution are agreed first.

Live records are subject to a project-specific data position. Public demonstrations contain synthetic data only and remain separate from client environments.

Security and data handling
Technical boundary

Evidence verification, not certification.

Uriyel verifies operational evidence. It does not replace penetration testing, engineering, statutory inspection, security monitoring or formal certification. Cryptographic or tamper-evidence claims are made only where the implemented technical function has been explicitly tested and included in scope.

Review evidence boundary
Founding engagement

One site. £2,000 fixed.

Five working days from receipt of the agreed evidence set.